MAWSS reports on another Sanitary Sewer Overflow 04.02.26

April 2, 2026

MAWSS reports on another Sanitary Sewer Overflow

MOBILE, Ala. — Mobile Area Water & Sewer System (MAWSS) responded to a Sanitary Sewer Overflow on April 2 from a manhole at 5454 Zeigler Boulevard. Approximately 235 gallons of wastewater overflowed into Three Mile Creek as a result of a root blockage on the main line.

MAWSS crews have cleared the blockage and are taking steps to prevent future overflows at this location. The overflow was reported by a citizen.

A SSO happens when untreated or partially treated sewage leaves the sanitary sewer system before reaching a wastewater treatment plant, such as from a manhole, broken pipe, pump station, or building cleanout. Sewage can contain bacteria, viruses, and parasites that cause diarrhea, vomiting, skin infections, and other illnesses.

Dr. Kevin Michaels, Health Officer for Mobile County, reminds residents to avoid contact with affected water, soil, and any obvious sewage, keep children and pets away from ditches, creeks, flooded areas, and standing water that may be contaminated, and not to swim, wade, or fish in posted areas or in water that looks or smells contaminated.

Most importantly if you have contact with possibly contaminated water or soil, wash skin and clothing thoroughly with soap and clean water as soon as possible.

Search

+